Windmill Farm Park, solar PV

 

A Greener Future: Windmill Farm Park’s Solar Installation Story.

Overview

Client:

Windmill Farm Park

 

Location:

Leicestershire, UK

 

Investment payback:

4 Years

Windmill Farm Park, a family-friendly destination offering farm and outdoor adventure experiences in South Leicestershire, has demonstrated its commitment to sustainability by integrating a solar energy solution. The farm worked with Plug Me In's solar division to install a 77.08 kWp solar photovoltaic (PV) system. Consisting of 188 high-efficiency solar panels, this system is expected to generate approximately 65,056 kWh of electricity per year, reducing the farm’s carbon footprint by an estimated 241 tonnes of CO₂ over a 20-year period.

A Greener Future: Windmill Farm Park’s Solar Installation Story

Installation details
The solar panels were installed on two farm buildings with pitched roofs - one featuring a cement fibre roof and the other a trapezoidal roof. A pitched roof mounting system was used, whereby brackets were fixed to the roof, rails were laid across and panels were then mounted onto the rails. The installation was completed within a three-week timeframe, carefully planned to ensure minimal disruption to the farm’s operations and visitors.

 

Financial and environmental impact
The solar installation at Windmill Farm Park is expected to achieve a payback period of four years, with immediate savings on the farm’s energy bills. In the first year alone, the farm anticipated saving around £19,940. Over the life of the system, the energy generated will contribute significantly to both financial savings and environmental benefits, reinforcing the farm’s dedication to green energy.


Windmill Farm Park key details:

Windmill Farm Park see first year financial savings of £19,940, The installation, comprising of 188 PV panels took 3 weeks from start to finsih.
Emissions Saving:
421 tonnes
over a 20 year period
System Capacity
77.08kWp
188 PV panels
Power generation:
65,056 kWh
Circa, per annum
Investment payback
4 years
Full return on investment within 4 years of installation.